2026-03-31
Heartbeat Log
-
~01:54 UTC — Issue-assigned wake on TEC-43 (Task failures).
- Status:
in_review. Board posted new comment continuing architecture discussion. - Board asked about: (1) using existing workspace skill in .builders for agent workspaces, (2) whether Paperclip supports external plugins for adapters, (3) image factory via CRA-23 for extending Paperclip image
- Responded with analysis: workspace skill ready, adapter system is compile-time static (no dynamic loading), plugin system is runtime but separate from adapters, image factory is the right path for custom adapters
- TEC-29 still blocked on upstream PR #2015 lockfile issue
- Monthly spend: $205.12
- Status:
-
~02:00 UTC — Issue-assigned wake on TEC-47 (SRE / L1 support hire).
- Board asked whether to hire an SRE agent for k8s lab monitoring/maintenance
- Reviewed current team (5 agents), k8s-lab Taskfile (maintenance tasks exist but nobody runs them), monthly spend ($508)
- Recommendation: Yes. Operational work is distinct from Lead Platform Engineer’s build focus. Proposed Sonnet agent, 30min heartbeat, reporting to Founding Engineer, ~$30-50/mo incremental
- Updated TEC-47 with plan in
<plan>tags, reassigned to board for approval - TEC-29 still blocked, no new context — skipped per dedup rule
-
~02:13 UTC — Comment-mention wake on TEC-43 (Task failures).
- Board asked about fork vs upstream strategy for image factory: should we use upstream + overlay our adapters, or use our fork?
- Analyzed: adapter registry is compile-time static, can’t overlay — need source build from fork
- Recommended: integration branch (
custom-adapters) that merges from upstreammasterregularly, image factory builds from that branch - Divergence risk low — our changes are self-contained adapter packages + 3-5 registry import lines
- Set TEC-43 back to
in_review - Monthly spend: $210.02
-
~02:22 UTC — Comment-mention wake on TEC-43 (Task failures).
- Board suggested splitting: keep TEC-43 focused on resource fix, move architecture discussion to new ticket
- Agreed. Created PR #55 in ai-dev: bumps Paperclip pod from 2Gi/1CPU to 6Gi/2CPU
- Reassigned TEC-43 to board for PR review
- Architecture work (image factory, adapter system, per-agent pods) to be tracked separately under TEC-29
-
~10:25 UTC — Heartbeat timer wake.
- TEC-29 (OpenCode agents): Checked adapter availability —
opencode_remotestill not in running server’s adapter list. Image was built successfully (Run #23783551233, board confirmed) but pod needs restart since tag (integration) didn’t change. Set toblocked, commented with restart instructions for board. - TEC-69 (Integrate Ideogram): New task, checked out and delegated. Created 5 subtasks:
- TEC-70: Ideogram API key → central secret store (SRE, todo)
- TEC-71: article-outline skill (Managing Editor, todo)
- TEC-72: article-draft skill (Managing Editor, backlog)
- TEC-73: image-generate skill with Ideogram (Managing Editor, backlog)
- TEC-74: social-and-briefs + article-pipeline skills (Managing Editor, backlog)
- Submitted hire request for The Long Run Writer agent (claude_local, Sonnet, reports to Managing Editor). Approval: b15c3b90.
- Monthly spend: ~$244
- TEC-29 (OpenCode agents): Checked adapter availability —